Why the survey was done
Syokimau Farm Limited instructed Savanna Survey & Planning Consultants to carry out cadastral due diligence on the parcels it holds within LR No. 12715. The aim was to verify the cadastral registration of each parcel, reconcile the records with what is on the ground, and report any anomalies or irregularities found along the way. Work began on 21 August 2024.
What the surveyor did
The surveyor checked survey plans at the Survey Department in Ruaraka, worked from the official survey plan, and mapped the parcels from satellite imagery to establish each one's location, shape, size and boundaries. The scope covered:
- Delineating cadastral boundaries accurately.
- Computing and confirming the area of the parcels.
- Comparing ground measurements with the official cadastral plan.
- Reconciling and verifying cadastral documents with the Ministry of Lands Survey Department.
- Preparing a technical surveyor's report on the findings.
Laws followed
- Survey Act, Cap 299, and its regulations
- The Cadastral Survey Manual
- Physical Planning Act, Cap 286
- Land Act, 2012
- Land Registration Act, 2012
- National Land Commission Act, 2012
Findings
100 parcels identified
The survey identified 63 parcels that the company holds jointly with members, outlined red on the site plan, and 37 open, undeveloped plots that were never allocated to a member and belong to the company, outlined green. The ground status of each parcel, from fenced and untouched to fully built, is in the parcel register.

Registration status
Most of the parcels appear to be registered. However, most of the people who have already built on them have no proper documentation, and there is very little information about who owns the developments. Most public utilities appear to have been developed.
Members register and original scheme
The members register from the company's management is attached to the report. The surveyor also obtained the original subdivision scheme plan that produced the current cadastral work and titles, and found that the original work by surveyor J. Maeke was well done.
Areas needing an audit
An audit is needed to establish whether the subdivision of the five-acre plots was done according to the law, and to identify all public utilities provided for in the subdivision scheme plan of LR No. 12715.
Limitations
The surveyor records that the work was limited because:
- Not all records could be obtained from the land registrar to compare the first allottees with the current records at the Chief Registrar's office, because of the long process involved.
- It was not possible to clarify how some transfers were made: some files were locked away, some were missing, and others are under active investigation.
- The subdivision scheme plan of LR No. 12715 could not be obtained immediately.
- Resources were too limited to compare the full original members list with the current registration of every plot.
- There was not enough time to resolve every issue the company raised.
Recommendations
- Carry out a resurvey to correct cadastral inaccuracies.
- Re-establish all the beacons of the five-acre plots.
- Extend control points from the Mlolongo pillar to create an accurate control network for future survey work in the area.
- Audit whether the subdivision of the five-acre plots was done according to the law.
- Identify all public utilities provided for in the subdivision scheme plan of LR No. 12715.
- Ask the Chief Registrar to order the production of records on the current status of all Syokimau Farm plots.
Subdivision scheme plan
The scheme plan shows the numbered plots of LR No. 12715 between Mombasa Road and Airport Road, with planning zones. Zone 0 allows commercial, institutional, office, residential and light industrial use. Zone 1 allows commercial, office and residential use, including flats of up to four storeys. Zone 2 is for institutional and office use.